Samafab Engineering LLP +91 261 2896959

Infrastructure

Sr. No. Item Details Quantity
1 Office Containers - 2
2 Welding Machines 400 Amp, 3 Phase 35
3 Grinders 4", 5", 7" 35
4 Ovens (Mother Oven) For pre heating of welding rods 2
5 Ovens (Portable) For pre heating of welding rods 25
6 Expander (Manual) For 1 in to 3 in OD tube 1 Set
7 Expander (Hydraulic) For 1 in to 3 in OD tube 1
8 Oxy-acetylene Cutting Sets With bottles/tubes 15
9 Argon Welding Sets - 30
10 Drilling Machine Drilling up to 2 in dia 2
11 Magnetic Drilling Machine Drilling up to 19 mm dia 1
12 Metal Thickness Tester Ultrasonic 1
13 Measuring Instruments Vernier, spanner sets, tapes, etc. Many
14 Workshop Tools All the tools required for a workshop Many
15 Chain Pulley Block 5 tonnes 5
16 Chain Pulley Block 10 tonnes 2
17 Chain Pulley Block 1/2 tonnes 12
18 Rope Pully 4", 6" 4
19 Nylon Ropes with Pulley 20 meters 4
20 Wire Rope 12 mm 50 meters 2
21 Scaffolding Material - Lot
22 Ladder 9 Meter Extendable 3
23 Hydraulic Testing Pump Manual 3
24 Hydraulic Testing Pump Electric 2
25 Pipe Bending Machine Up to 4" dia pipe 1
26 Safety Equipment Safety belts, helmets, specks, etc. As required

Team Strength

Role Strength Qualification
Management 5 MBA, B-Tech
Engineers 10 B-Tech - Mechanical
Clerical Staff 6 -
Safety Officers 3 -
Skilled Workers 45 -
Semi-skilled and Un-skilled Workers 140 - 200 Depending on project load